Al Turiki, A.
Abdullah Al Turiki is a Khurais Producing Department Technical Advisor with more than 15 yr of experience in rotating equipment. He joined the company as a machinist and then focused on rotating equipment after joining the reliability unit as a technical advisor. His experience includes troubleshooting, condition monitoring and leading reliability programs. The author can be reached at Abdulah.turiki@aramco.com.
High-pressure gas compressor dry gas seal system enhancement case study
The Khurais producing department (KhPD) consists of four oil trains: each oil train is responsible for receiving, stabilizing and purifying the crude oil from the wells by removing sand, water, gas and hydrogen sulfide (H2S) contents to make the oil ready for use and shipment to refineries.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Britain will not bail out bioethanol industry hit by Trump trade deal 8/15
- Russian energy facilities targeted recently in drone attacks 8/15
- Shell: Norco, Louisiana (U.S.) refinery gasoline unit work to start on Friday 8/15
- Sanctions-hit Indian refiner Nayara in talks with govt to sustain operations 8/15
- The API challenges Trump plan to cut biofuel import credits 8/15
- IAG selects record 29 startups for accelerator program 8/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction