Alabdulkarim, A. Y.
Case history: Troubleshooting a leaking valve in a hydrogen unit
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Engineering & Design
/ Equipment
/ Europe
/ Middle East
/ Pumps
/ Safety
A Middle East refinery installed a hydrogen plant that was designed to produce 20,000 Nm3/hr of pure hydrogen (H2) to support a diesel hydrotreater. The unit was commissioned in 2006. This H2 plant wa..
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction