Khan, S.
Sharib Khan is a Reliability Engineer with Saudi Aramco. He has 32 yr of rotating equipment experience in oilfield plants, with an emphasis on pumps, gas turbines, air and gas compressor systems, and troubleshooting. Mr. Khan is also a certified reliability leader, a certified maintenance and reliability professional, a certified vibration analyst (ISO Category 3) and a certified machinery lubrication analyst. He earned a BS degree in mechanical engineering from Aligarh Muslim University in Aligarh, India.
Pump recycle line optimization and energy savings
The objective of this article is to demonstrate the benefits of optimizing the pumping system through pump recycle line evaluations.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Fire at Russian petrochemicals plant kills at least three 4/2
- NH3 Clean Energy selects Linde to deliver FEED for the WAH2 project 4/2
- Phelan Green selects Honeywell process technology for flagship South African eSAF facility 4/2
- Metafuels secures Dutch government grant to advance Rotterdam eSAF project 4/2
- Topsoe partners with Hynfra P.S.A. to advance green ammonia in Jordan 4/2
- China calls for independent refiners to maintain fuel output amid war disruption 4/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

