Rinawi, A.
Abdulkarim Rinawi is a piping and vibration specialist at Saudi Aramco. He has 28 yr of experience with piping, structural and rotating equipment vibration, pressure pulsation, pipe stress and flow analysis in refining, piping, pipelines, power generation and nuclear facilities. Dr. Rinawi has a PhD in structural engineering from the University of California at Berkeley.
Resolving vibration problems in a crude booster pump
Valves
/ Pumps
/ Loss Prevention
/ Equipment
/ Engineering & Design
/ Maintenance & Reliability
/ Refining
/ Corrosion
/ Compressors
The pumps referred to in this article are 2,600-HP vertical pumps utilized as booster pumps for the shipment of crude oil.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- bp's Gelsenkirchen refinery attracts buyer's interest from Klesch 2/10
- Fire at Baiji refinery contained, Iraq's Somo says 2/10
- Hengli Petrochemical sets up Dubai trading subsidiary in expansion 2/10
- Canadian airlines suspend Cuba flights as island set to run out of jet fuel 2/10
- Idemitsu Kosan plans maintenance at Keihin refinery in April 2/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

