Turcan, D.
Dr. Doru C. Turcan is a vibration engineer. At present, his role includes vibration analysis, conducting vibration analysis trainings, standards and procedures development and conducting a company-wide vibration monitoring benchmarking program. He has more than 20 yr of rotating equipment troubleshooting experience.
Resolving a chronic water injection pump high vibration through a shaft-lifting technique
Environment & Safety
/ Maintenance & Reliability
/ Refining
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Pumps
/ Safety
/ Middle East
This article explores the investigation into the chronic high vibration issues of a particular water injection pump.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- bp's Gelsenkirchen refinery attracts buyer's interest from Klesch 2/10
- Fire at Baiji refinery contained, Iraq's Somo says 2/10
- Hengli Petrochemical sets up Dubai trading subsidiary in expansion 2/10
- Canadian airlines suspend Cuba flights as island set to run out of jet fuel 2/10
- Idemitsu Kosan plans maintenance at Keihin refinery in April 2/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

