Arana, T.
Based in Houston, Texas, Tony Arana is the Southwest Territory Sales Manager at SIFCO ASC. He has more than 30 yr of experience in surface plating and chemical engineering in the oil and gas, aerospace, power generation and general industries.
Down with downtime: Repair complex petrochemical components with selective electroplating
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Project Management
/ Refining
/ Construction
/ Corrosion
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Safety
/ Valves
/ Americas
The volatile impact of the coronavirus pandemic hit at the same time the petrochemical industry was entering a downcycle.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Fertiglobe, Covestro and TA’ZIZ sign MoU to explore strategic ammonia collaboration 2/9
- S-Oil signs nearly $4-B PE marketing deal with SABIC 2/9
- Indonesia's Pertamina launches $7-B natural resources processing initiative 2/9
- Digital Exclusive: Innovative grassroots CDU-VDU configuration—Pioneering energy efficiency and net-zero pathways in modern refineries 2/9
- Update: Union agrees to U.S. refineries contract, averting nationwide strike 2/9
- Schneider Electric unveils EcoStruxure™ Foxboro software defined automation 2/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

