Burgess, J.
Improve relief-device sizing under supercritical conditions
Environment & Safety
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Loss Prevention
/ Management
/ Middle East
/ Safety
Properly sized relief devices under supercritical conditions are vital to processing natural gas and gas condensates into olefins. These processes operate near the critical locus of the process gases ..
Relief valve and flare action items: What plant engineers should know
Environment & Safety
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Middle East
/ Valves
This article can help the plant engineer review the concerns developed by the design engineer. Implementing field modifications without performing such a review is costly and exposes a facility to unjustified risks.
Relief device inlet piping: Beyond the 3 percent rule
With careful consideration, an engineer can be certain that an installation will not chatter
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction