Van Der Eijk, J.
Johan Van Der Eijk is Process Manager at TechnipFMC’s operating center in the Netherlands. He leads the process design department and has 25 yr of experience in process engineering with a specialization in the petrochemical industry. His experience includes work on proposals, studies, grassroots, revamp and development projects as process lead engineer, as well as participation in training, root cause analysis, test runs, startups and troubleshooting. Since 2008, he has been a part of the TechnipFMC Experts Network as an Expert (and since 2014 as Main Expert) in ethylene, with expertise in cracking furnaces.
Triple-lane layout for enhanced cracking coil performance
Ethylene is a precursor to many chemicals, fibers and plastics that are used in daily life.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- Fertiglobe, Covestro and TA’ZIZ sign MoU to explore strategic ammonia collaboration 2/9
- S-Oil signs nearly $4-B PE marketing deal with SABIC 2/9
- Indonesia's Pertamina launches $7-B natural resources processing initiative 2/9
- Digital Exclusive: Innovative grassroots CDU-VDU configuration—Pioneering energy efficiency and net-zero pathways in modern refineries 2/9
- Update: Union agrees to U.S. refineries contract, averting nationwide strike 2/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

