Van Der Eijk, J.
Johan Van Der Eijk is Process Manager at TechnipFMC’s operating center in the Netherlands. He leads the process design department and has 25 yr of experience in process engineering with a specialization in the petrochemical industry. His experience includes work on proposals, studies, grassroots, revamp and development projects as process lead engineer, as well as participation in training, root cause analysis, test runs, startups and troubleshooting. Since 2008, he has been a part of the TechnipFMC Experts Network as an Expert (and since 2014 as Main Expert) in ethylene, with expertise in cracking furnaces.
Triple-lane layout for enhanced cracking coil performance
Ethylene is a precursor to many chemicals, fibers and plastics that are used in daily life.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Britain will not bail out bioethanol industry hit by Trump trade deal 8/15
- Russian energy facilities targeted recently in drone attacks 8/15
- Shell: Norco, Louisiana (U.S.) refinery gasoline unit work to start on Friday 8/15
- Sanctions-hit Indian refiner Nayara in talks with govt to sustain operations 8/15
- The API challenges Trump plan to cut biofuel import credits 8/15
- IAG selects record 29 startups for accelerator program 8/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction