Allah, W. K.
Wesam Khalaf Allah is a Saudi Aramco Engineer specialized in rotating equipment. He is currently a graduate mechanical engineering student at Texas A&M University.
Intensive study on damaged wear rings of centrifugal pumps—Part 2
This article is a continuation of Part 1, which discussed the evaluation of two damaged wear rings from centrifugal pump applications—a stationary (inner) ring and a rotating (outer) ring.
Intensive study on damaged wear rings of centrifugal pumps—Part 1
This article is based on damaged wear rings from centrifugal pump applications.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

