Putra, Z. A.
is a process engineering and process technology consultant at TMC Chemical in The Netherlands. He has been involved in a wide range of work activities, such as conceptual process designs, feasibility studies, basic engineering design and plant performance evaluations, which include process simulation, optimization and debottlenecking studies. He holds a PDEng degree from Technische Universiteit of Eindhoven.
Improve performance and reduce costs of wastewater treatment plants
The increasing costs of a wastewater treatment plant (WWTP) motivated a major specialty chemical plant to improve the performance of its treatment unit.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

