Yavuz, G. D.
Gözde Dönmez Yavuz is Process Superintendent at TÜPRAŞ headquarters within the process and equipment development department. Before this position, she worked as a Process Engineer for 6 yr and was responsible for hydroprocessing units before moving to Simulation Superintendent. She holds a BS degree in chemical engineering from Middle East Technical University and an MS degree in fuel and energy technologies from Boğaziçi University in İstanbul, Turkey. The author can be reached at Gozde.Donmez@Tüpraş.com.tr
CO2 emissions reduction via a pinch study in a vacuum distillation unit
The project detailed here was carried out on a vacuum distillation unit (VDU) in the TÜPRAŞ İzmir refinery.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

