Wicklow, C.
Targeted liquid injection improves shed deck performance
Process Optimization
/ Project Management
/ Refining
/ Americas
/ Asia/Pacific
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Management
/ Middle East
This case study shows how the installation of an unique piping and lance design achieved targeted liquid injection, quenched vapor hot zones and reduced resid entrainment into the heavy coker gasoil product.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction