Bowers, G.
graduated from Ohio State University with a BS degree in engineering physics. He began his career at VEGA Americas Inc. in 2009 in the field service department, later moving to the development and testing of the ProTrac product line.
Effects of changing vapor phase conditions on radiation-based continuous level measurement
Radiation-based continuous level gauges provide highly reliable measurements because no part of the instrument system is exposed to the process fluid, and they do not require penetration into the process vessel.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

