M. Y. Iqbal
Muhammad Yousuf Iqbal is the Principal Engineer, Process, at Worley Engineering Oman, and has more than 19 yrs of experience in conceptual design and plant optimization. He has led multiple projects in the oil and gas segment, including gas sweetening and dehydration, gas compression, gas transmission lines and crude separation, stabilization, manifolds design, and enhanced and design plant utilities, particularly steam, fuel gas, sour water stripper, sulfur recovery unit (SRU) basic design and enhancement. Iqbal has contributed his engineering skills to clients around the globe.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

