M. Y. Iqbal
Muhammad Yousuf Iqbal is the Principal Engineer, Process, at Worley Engineering Oman, and has more than 19 yrs of experience in conceptual design and plant optimization. He has led multiple projects in the oil and gas segment, including gas sweetening and dehydration, gas compression, gas transmission lines and crude separation, stabilization, manifolds design, and enhanced and design plant utilities, particularly steam, fuel gas, sour water stripper, sulfur recovery unit (SRU) basic design and enhancement. Iqbal has contributed his engineering skills to clients around the globe.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- bp's Gelsenkirchen refinery attracts buyer's interest from Klesch 2/10
- Fertiglobe, Covestro and TA’ZIZ sign MoU to explore strategic ammonia collaboration 2/9
- S-Oil signs nearly $4-B PE marketing deal with SABIC 2/9
- Indonesia's Pertamina launches $7-B natural resources processing initiative 2/9
- Digital Exclusive: Innovative grassroots CDU-VDU configuration—Pioneering energy efficiency and net-zero pathways in modern refineries 2/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

