Hwang K.
Kenneth Hwang is a registered professional chemical engineer with more than 20 yr of experience in the oil and gas industry. Dr. Hwang works for Zachry Engineering Corp. as a Senior Process Engineer, and received his PhD in chemical engineering from Texas A&M University in College Station, Texas.
Selecting amines for AGR facilities impacts LNG plant capacity
Alkanolamines have been used for acid gas removal from natural gas for several decades.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction