Gas Processing/LNG
Consider dual independent expander refrigeration for LNG production
New methodology may enable reducing cost to produce stranded gas
Select the correct LNG storage tank for your facility
Critical factors to consider in design options
Salt caverns bring security, economy and capacity to LNG receiving
Combining storage and receiving offers advantages
Improve acid-gas removal of LPG contactors
Consider using these practical troubleshooting and design techniques when optimizing liquid/ liquid contactors
Build a better NGL sour water stripping unit
Better design practices can enhance process performance
Small-scale LNG facility development
Include these vital design characteristics for improved project costs
Optimize your search for sulfur-recovery technology
New simulation techniques can clearly define sulfur reactions and processes for TGTUs
Consider optimized iron-redox processes to remove sulfur
New processing developments are overcoming operational obstacles of older units
Improve contaminant control in amine systems
These guidelines illustrate what every process engineer should know about solvent contamination and loss for sour gas processing facilities
Consider cryogenic methods to improve ammonia production
New technologies
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- SkyNRG starts construction on its first SAF plant in Delfzijl, the Netherlands 2/13
- India's Reliance wins U.S. license for Venezuelan oil 2/13
- Singapore light distillates stocks hit over 3-yr high on robust imports 2/13
- Three contractors injured at ExxonMobil facility in Beaumont, Texas (U.S.) 2/13
- China's epic renewables boom lifts it into rare clean capacity club 2/13
- TotalEnergies booked loss in France due to refining activities, CEO says 2/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

