Gas to liquids (GTL)
Select the optimum extraction method for LNG regasification
Varying energy compositions of LNG imports may require terminal operators to remove C2+ compounds before injecting regasified LNG into pipelines
Design a turnkey floating LNG facility
Important factors to consider when planning an FPSO
Consider cryogenic methods to improve ammonia production
New technologies
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- European Commission unveils plan to drop ICE ban in the EU 12/18
- U.S. EPA expects to finalize biofuel rules in first quarter of 2026 12/18
- German cabinet approves draft biofuels law, food-based ingredient use to continue 12/18
- NextChem opens new plastic upcycling plant in Italy 12/18
- Ineos' Sir Jim Ratcliffe calls on Europe's politicians to take immediate action to protect the European chemical industry 12/18
- MB Energy expands aviation fuel supply to airlines at Copenhagen Airport 12/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

