Gas to liquids (GTL)
LNG storage tanks: advancements in weld inspections
New inspection method improves jobsite examinations and verification of welds
Optimize energy integration for LNG terminals
Integrating heating requirements with adjacent facilities can provide economic bonus while improving operating efficiencies
Select the optimum extraction method for LNG regasification
Varying energy compositions of LNG imports may require terminal operators to remove C2+ compounds before injecting regasified LNG into pipelines
Design a turnkey floating LNG facility
Important factors to consider when planning an FPSO
Consider cryogenic methods to improve ammonia production
New technologies
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 greenlights new gas plant and fractionator projects, advancing integrated wellhead-to-market strategy 5/18
- OXEA and Air Liquide renew syngas and hydrogen supply agreement for Oberhausen site 5/18
- BASF boosts refinery catalyst innovation with new R&D center in Attapulgus, Georgia (U.S.) 5/18
- Aster and Puraglobe sign MoU to bring world-leading re-refining technology to Asia 5/18
- U.S. oil refiners finally profit from biofuels due to mandates, high fuel prices 5/18
- China's April oil throughput hits lowest since August 2022, inventories rise 5/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

