Heat Transfer
Consider cryogenic methods to improve ammonia production
New technologies
Temperature cross-based criterion for multipass heat exchanger design
A simple equation and graphic procedure give better results
Compact condensing: new technology improves on traditional approach
Benefits include higher efficiency and lower capital and installation costs
Optimize reboiler design
Use these guidelines for best performance
Superheaters: design and performance
Understand these factors to improve operation
Is ultrasound leak detection reliable for steam traps?
Know the conditions that invalidate reliability of this method
Guidelines help energy engineers and managers
Here are new guidelines, checklists and an integrated approach for a successful energy conservation program
Consider outsourcing energy supplies
Users can avoid capital expenditures and save on steam and electricity costs
Hydrogen—what are the costs?
HPI operating facilities have many choices on how to meet their rising demand for H2; here are several options
Improve condensate recovery systems
Using these fundamental design guidelines, plant engineers can improve the operation and reliability of steam distribution systems
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

