Loss Prevention
Inherently safer design
Implementation challenges faced by new and existing facilities
Thermal oxidizing systems
Test your knowledge to improve your refinery’s safety and reliability
Improve facility SIS performance and reliability
Use solenoids to partial stroke test block valves
Operator maintenance - key to reducing breakdowns
Here are the benefits and implementation procedures
Pregrouted baseplates reduce installation time and costs
Improving pump reliability is another benefit
Critical situation management – avoid the pitfalls
Guidelines are based on over 50 projects
Improving reliability of chemical processing facilities
An enterprise reliability management system offers powerful failure analysis capabilities
Include your field work force in the automation loop
New technologies reduce maintenance costs and increase productivity
Risk-based approach to near miss
Here's a systematic process for first defining and then documenting incidents
The safe automation gap – Part 2
SIS design, operation and maintenance are critical tools to bridge this division
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Topsoe and Sasol bring advanced SAF technology to Allied Biofuel’s landmark project in Uzbekistan 7/14
- Siemens Energy begins preparations for the launch of an independent brand 7/14
- Emerson helps Romania’s largest refinery reduce control system alarms by over 95% 7/14
- Bunker One executes Latin America's first bioethanol bunkering of a deep-sea container vessel 7/14
- Kognitiv Spark advances the future of connected field worker collaboration 7/14
- EIA: Global LNG trade volumes reached record high in 2025 7/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

