Process Optimization
Document management throughout plant construction
Electronic system can improve design and communications between engineers, contractors and operators
World-class pipe-spool fabrication
Use these guidelines and checklist to evaluate a fabricator's ability to deliver the specified product on time
Calculate water in combustion air
A simple procedure estimates combustion-air moisture from wet- and dry-bulb temperatures
High-capacity distillation
New directions with trays increase tower capacities
Influence of piping vibration on pump shaft cracks
Vibration analysis found the problem
Improve DMT production
New processing techniques reduce raw material consumption for this polyester precursor
Successful closed-loop olefins plant optimization
Most of the important factors do not involve optimizer mechanics
Simple method determines flow regime for friction factor calculations
Use these criteria to avoid trial-anderror procedures
Successfully transfer HPI proprietary technology
Licensing processes does not end at basic design, rather it is a continuous communication that passes knowledge and experience between the licensor and client
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- SkyNRG starts construction on its first SAF plant in Delfzijl, the Netherlands 2/13
- India's Reliance wins U.S. license for Venezuelan oil 2/13
- Singapore light distillates stocks hit over 3-yr high on robust imports 2/13
- Three contractors injured at ExxonMobil facility in Beaumont, Texas (U.S.) 2/13
- China's epic renewables boom lifts it into rare clean capacity club 2/13
- TotalEnergies booked loss in France due to refining activities, CEO says 2/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

