Project Management
Foster Wheeler and consortium partners sign GES+ contract with Saudi Aramco
Foster Wheeler AG announced that a subsidiary of its Global Engineering and Construction Group together with the subsidiary’s consortium partners comprising A. Al-Saihati, A. Fattani & O. Al-Othman Consulting Engineering Co., (SOFCON) and Saudi Consolidated Engineering Company- Khatib & Alami (SCEC K&A) have signed a contract with Saudi Aramco for the provision of services associated with Saudi Aramco’s General Engineering Services Plus (GES+) initiative for a duration of five years with options available for extensions.
Improving pH control mitigates corrosion in crude units
Equipment and pipe failures can be avoided through better desalting practices and inhibitor injections
Avoid brittle fracture in pressure vessels
Key points identify effects from auto-refrigeration on steel vessels
Process safety: Blind spots and red flags
Improving safety for organizations involve more than technological solutions; understanding processes and plant interactions are a must
HP Construction: North America
Sasol plans to construct what is said to be the world’s first commercial ethylene tetramerization unit, capable of producing over 100,000 metric tpy of combined 1-octene and 1-hexene at its Lake ..
HP Construction: South America
Albemarle Corp. and Petrobras have signed a memorandum of understanding to build a world-scale hydroprocessing catalyst (HPC) production plant on the site of their existing joint-venture Fabrica Cario..
HP Construction: Europe
Mitsubishi Heavy Industries, Ltd. (MHI) and Sojitz Corp., Japan, jointly with China National Chemical Engineering Corp. (CNCEC), have received an order from Joint Stock Co. Ammoni of the Republic of T..
HP Construction: Middle East
GE has been selected by Saudi Aramco, for agreements totaling nearly $500 million, to supply a broad range of equipment and services for an expansion of the Shaybah gasoil processing facilities. Valua..
HP Construction: Asia-Pacific
Synthesis Energy Systems, Inc. (SES) has successfully completed a commercial-scale demonstration test in which more than 2,000 tons of high-ash coal from Queensland, Australia, was gasified at its Zao..
How would you rate leadership of your capital projects?
To achieve substantially improved benchmarks in project performance, profound change is needed
- UPM unlocks new bio-based markets as Leuna biorefinery produces its first commercial product 12/19
- Stamicarbon awarded technology licensing contract for new urea plant in Eastern China 12/19
- Ford takes $19.5-B writedown on EV business 12/19
- Babcock & Wilcox awarded $40-MM contract for advanced wet gas scrubbing technology at Canadian petroleum refinery 12/19
- Aarti Industries secures methanol and toluene feedstock supply through multiple long-term contracts 12/19
- bp picks first outsider CEO Meg O'Neill after abrupt Auchincloss exit 12/19

