Rotating Equipment
Behavior of dry-running piston rod sealing systems in crosshead compressors
Various designs and materials were investigated
Designing small-bore piping and valve connections
Follow these guidelines to improve reliability
Segregated and integrated process and antisurge compressor control systems
A proven design eliminated control interactions in this ethylene cracker facility
Consider regenerative pumps for low-flow/low-NPSH applications
In low-flow applications they use less horsepower when 'curve run-out' is considered
Oil mist system provides rapid payback
Benefits included lower maintenance costs and reduced lost production
Improved pump hydraulic selection reduces cavitation risk
Follow these guidelines to improve reliability
Hybrid fault patterns for diagnosing gas turbine component degradation
Faults and their locations can be identified by analyzing efficiency and vibration simultaneously
Boost gas turbine performance by inlet air cooling
Use these guidelines to evaluate the options
Gas turbine fuel nozzle refurbishment
Follow these guidelines to improve reliability and reduce emissions
How piston ring design affects dry-running hydrogen compressor capacity
Tests reveal the best choices
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

