Bader, J.-M.
Case history: Sasol’s optimization of the catalyst regeneration process for C5 isomerization
Process Control
/ Process Optimization
/ Refining
/ Americas
/ Analyzers
/ Asia/Pacific
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Information Systems
/ Management
/ Middle East
Advanced process control (APC) offers solutions to use full catalyst regenerator capacity safely and to generate substantial benefits. Significant yield increases and operating cost reductions can be ..
Use a systematized approach of good practices in pygas hydrogenation via APC
APC with inferential modeling was successfully applied to pygas hydrogenation units. The lengthening of the catalyst run length limits downtime for both the pygas unit and upstream units such as the steam cracker.
Use real-time optimization for low-sulfur gasoline production
As the main sulfur source in the gasoline pool, fluid catalytic cracker (FCC) gasoline cuts must undergo severe hydrodesulfurization (HDS) processing to achieve ultra-low-sulfur gasoline (ULSG) pool s..
Increase MTBE plant productivity
Applying advanced process control solutions enabled raising unit output without a major retrofit of existing equipment
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Moleaer partners with Xylem to globally scale nanobubble technology for water treatment 9/5
- Emvolon and Montauk Renewables announce launch of JV to convert biogas into high-value, low-carbon fuel 9/5
- NETL researchers gasify plastic waste with coal and biomass for improved hydrogen-rich gas production 9/4
- Digital Exclusive: Improving rotor performance with the high-speed balancing bunker 9/4
- U.S. biodiesel and renewable diesel imports fall sharply in 2025 after tax credit change 9/4
- Axens kicks-off first worldwide full-SAF unit in Asia 9/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction