Russell, W.
A CFD study on the effect of operating an SMR furnace without one of the flue gas tunnels A
Maintenance & Reliability
/ Petrochemicals
/ Refining
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrogen
A computational fluid dynamics study was performed on a theoretical reforming furnace to determine the comparative results of flow uniformity in flue gas tunnels with and without a standing tunnel in the outer position.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- bp's Gelsenkirchen refinery attracts buyer's interest from Klesch 2/10
- Fire at Baiji refinery contained, Iraq's Somo says 2/10
- Hengli Petrochemical sets up Dubai trading subsidiary in expansion 2/10
- Canadian airlines suspend Cuba flights as island set to run out of jet fuel 2/10
- Idemitsu Kosan plans maintenance at Keihin refinery in April 2/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

