Zengjun, Y.
Yang Zengjun is a Senior Engineer at CTCI Beijing, a CTCI company. He is also a member of the CPCEA HVAC Professional Committee, a registered utility engineer (HVAC, power), a registered constructor and a registered consulting engineer. He is primarily engaged in HVAC design for petrochemical plants.
Design optimization of an HVAC system in a petrochemical plant’s controls building
Distributed Control System
/ Environment
/ Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Process Control
/ Engineering & Design
/ Safety
Since petrochemical plant control buildings are usually designed to be blast-resistant without external windows, convection ventilation cannot be carried out, leading to poor air circulation. As a result, there are higher requirements for indoor air quality, and it is necessary to optimize the heating, ventilation and air conditioning (HVAC) system design scheme to improve air quality.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Shell Aviation, Accenture, and Amex GBT expand Avelia into a multi-supplier SAF solution 7/16
- ORLEN and Krajowa Grupa Spożywcza sign MoU to accelerate biomethane production in Poland 7/16
- New plants, U.S. trade worries to drive China's 2025 naphtha imports to record 7/16
- Blue Water significantly reduces CO2 emissions by switching to HVO in port operations 7/16
- Swire Shipping launches new carbon insetting program – ‘Voyage to Zero’ 7/16
- China's surplus crude oil surges in June, giving refiners options 7/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction