Zengjun, Y.
Yang Zengjun is a Senior Engineer at CTCI Beijing, a CTCI company. He is also a member of the CPCEA HVAC Professional Committee, a registered utility engineer (HVAC, power), a registered constructor and a registered consulting engineer. He is primarily engaged in HVAC design for petrochemical plants.
Design optimization of an HVAC system in a petrochemical plant’s controls building
Distributed Control System
/ Environment
/ Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Process Control
/ Engineering & Design
/ Safety
Since petrochemical plant control buildings are usually designed to be blast-resistant without external windows, convection ventilation cannot be carried out, leading to poor air circulation. As a result, there are higher requirements for indoor air quality, and it is necessary to optimize the heating, ventilation and air conditioning (HVAC) system design scheme to improve air quality.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- bp's Gelsenkirchen refinery attracts buyer's interest from Klesch 2/10
- Fire at Baiji refinery contained, Iraq's Somo says 2/10
- Hengli Petrochemical sets up Dubai trading subsidiary in expansion 2/10
- Canadian airlines suspend Cuba flights as island set to run out of jet fuel 2/10
- Idemitsu Kosan plans maintenance at Keihin refinery in April 2/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

