Lemmers, S. P. B.
Sander P. B. Lemmers is Head of the Project Development Department in Dialog E&C Sdn Bhd. He has more than 26 yr of experience in both the technical and business facets of the global engineering, procurement and construction industry. Lemmers is involved in the development of small- and large-scale LNG and other liquefied gas and hydrocarbon terminals in Malaysia and Southeast Asia. He holds a BSc degree and an MSc degree in industrial engineering and management, and an MSc degree in chemical engineering, from Twente University for Technical and Social Sciences in Enschede, the Netherlands.
Variable-speed pumps and minimum flow control valves: Design and implementation
Within hydrocarbon storage terminals, product pumps are the most vital rotating equipment for terminal operations and maintenance.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- SIBUR develops new polyethylene grade for FMCG packaging 8/13
- L&T Energy GreenTech partners with Japan’s ITOCHU for 300,000-tpy green ammonia project 8/13
- VINCI wins major contract for innovative biofuels plant in Spain 8/13
- Orlen Unipetrol to shut ethylene unit at Litvinov plant for several days 8/13
- Dangote Refinery cuts fuel price before planned sales to local Nigerian market 8/13
- Chevron Phillips Chemical completes low-viscosity PAO expansion in Belgium 8/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction