Lemmers, S. P. B.
Sander P. B. Lemmers is Head of the Project Development Department in Dialog E&C Sdn Bhd. He has more than 26 yr of experience in both the technical and business facets of the global engineering, procurement and construction industry. Lemmers is involved in the development of small- and large-scale LNG and other liquefied gas and hydrocarbon terminals in Malaysia and Southeast Asia. He holds a BSc degree and an MSc degree in industrial engineering and management, and an MSc degree in chemical engineering, from Twente University for Technical and Social Sciences in Enschede, the Netherlands.
Variable-speed pumps and minimum flow control valves: Design and implementation
Within hydrocarbon storage terminals, product pumps are the most vital rotating equipment for terminal operations and maintenance.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

