Tan, P. C.
Pui Chew Tan is Manager, Instrumentation and Control, and has been working with Dialog E&C Sdn Bhd for 9 yr. Prior to that, he had several roles as an electrical and instrument maintenance engineer in a power station, a DCS and PLC programmer, and as an application engineer with General Electric. Tan earned a degree in electrical engineering from Melbourne University.
Variable-speed pumps and minimum flow control valves: Design and implementation
Within hydrocarbon storage terminals, product pumps are the most vital rotating equipment for terminal operations and maintenance.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction