Leavitt, D.
David Leavitt is a Business Development Manager for Emerson’s Automation Solutions business, and is based in Colorado Springs, Colorado. He has 15 yr of experience in the oil and gas, power, mining and water/wastewater industries. Mr. Leavitt graduated with a mechanical engineering degree from the U.S. Naval Academy in Annapolis, Maryland.
How valve upgrades can improve tank and terminal facility operations
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Information Systems
/ Loss Prevention
/ Products
/ Pumps
/ Safety
/ Valves
Tank and terminal facility profitability ultimately rests on a handful of key performance indicators (KPIs). The ability to maximize tank capacity utilization—while minimizing the time it takes to load and unload ships, trucks and rail cars—drives the bottom line. All those transfers must happen quickly and accurately, while avoiding product contamination.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 greenlights new gas plant and fractionator projects, advancing integrated wellhead-to-market strategy 5/18
- OXEA and Air Liquide renew syngas and hydrogen supply agreement for Oberhausen site 5/18
- Commonwealth LNG gets green light to start construction of $13-B, 9.5-MMtpy LNG terminal 5/15
- ARENA to drive Australia's $1.1-B Cleaner Fuels Program 5/15
- Japan’s first green ammonia plant based on KBR’s K-GreeN process now fully operational 5/15
- Repsol's Chairman asserts the role of refining as a strategic industry for Spain and for Europe 5/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

