Turner, J.
HPI Focus: New vs. debottlenecking projects
Gas Processing/LNG
/ Petrochemicals
/ Process Optimization
/ Project Management
/ Refining
/ Americas
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Management
/ Middle East
/ Polymers
/ Safety
As most owners do not have adequately skilled engineering teams to study these scenarios, engaging an experienced, qualified engineering contractor to support the conceptual study is often warranted.
What are the experiences gained from clean fuels projects?
Early implementation of low-sulfur gasoline and diesel have yielded useful information for the next wave of projects in Europe
Consider revamping hydrotreaters to handle higher H2 partial pressures
Most clean fuel programs will reuse existing equipment. A thorough review of pressure ratings can optimize design opportunities
Control corrosion in washwater systems
When operating reactor wash units above design conditions residual salts can cause equipment failures
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

