Broad, R.
Robert Broad is a charted chemical engineer, Fellow of the Institution of Chemical Engineers in the UK, and a member of both the International Register of Professional Engineers and the European Federation of National Engineering Associations. Mr. Broad has worked more than 20 yr with compact heat exchangers, focusing on process optimization to reduce energy usage. He holds an MBA from Henley Management College in the UK.
Refinery revamp opportunities with welded plate heat exchangers
Environment & Safety
/ Carbon Management
/ Catalysts
/ Distillation
/ Engineering & Design
/ Environment
/ Equipment
/ Heat Transfer
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Loss Prevention
/ Reactors
/ Safety
The plate-and-shell (P&S) heat exchanger has three significant advantages over the shell-and-tube (S&T) type traditionally used in refinery processes.
Welded plate heat exchangers cut refinery process costs—Part 2
Maintenance & Reliability
/ Process Optimization
/ Refining
/ Construction
/ Crude oil
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Heat Transfer
/ Loss Prevention
/ Management
/ Natural Gas
/ Products
Plate-and-frame (P&F) heat exchangers were first manufactured 100 yr ago for use in the dairy industry.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

