Sood, A.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Kisuma enables rubber manufacturers to enhance durability and sustainability with DHT™-4 additives 9/8
- Altalto awards Maire engineering study contract for 23,000-tpy sustainable aviation fuel plant 9/8
- Steel cut for Yara Eyde: The world’s first ammonia-powered container ship 9/5
- Ukraine says it attacks Russian refinery at Ryazan, oil depot at Luhansk 9/5
- U.S. crude stockpiles rise as refineries begin maintenance 9/5
- Delta partners with Shell and the Port of Portland for commercial-scale SAF uplift at Portland International Airport 9/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction