McLeod, G.
Gavin McLeod has more than 40 yr of oil and gas experience, with an emphasis on systems completion and commissioning.
Phase-gate process for optimal turnaround performance: Long-range turnaround planning
The volume of turnaround (TAR) work in a limited physical space and within a compressed timeframe presents challenges for securing the required qualified workforce and ensuring quality control and health, safety and environment. For these reasons, excellent TAR planning is critical for successful outcomes.
Best practices for proper alarm management
Process alarms are critical safeguards put into place on operating units to enable operators to avoid incidents that impact a company’s safety, reliability and bottom line. It is absolutely essential to any safe facility operation that alarms are properly managed and utilized to address real and consequential operational issues before they become incidents.
Maximize benefits with robust maintenance planning and scheduling
Effective routine maintenance begins with effective leadership. Leadership requirements for a robust routine maintenance program include some high-level deliverables.
Operational excellence: Repetitive incidents in the energy business
Workforce demographics in the oil, gas, chemicals and other energy industries have altered personnel experience ratios.
- 1
- ... 1 pages
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15

