Schnittker, D.
Dour Schnittker is the VP of engineering at KP Engineering and has vast experience serving in technical and leadership roles in the downstream sector spanning 43 yr. He began his career at Placid Oil Co. in 1977 and transitioned to CB&I, where he led global project management before joining KP Engineering in 2017. Mr. Schnittker earned a BS degree in chemical engineering from Texas A&M University.
Renewable diesel: The latest buzzword in the downstream sector
Renewable diesel: this greener, cleaner fuel has taken our industry by storm.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Shell Aviation, Accenture, and Amex GBT expand Avelia into a multi-supplier SAF solution 7/16
- ORLEN and Krajowa Grupa Spożywcza sign MoU to accelerate biomethane production in Poland 7/16
- New plants, U.S. trade worries to drive China's 2025 naphtha imports to record 7/16
- Blue Water significantly reduces CO2 emissions by switching to HVO in port operations 7/16
- Swire Shipping launches new carbon insetting program – ‘Voyage to Zero’ 7/16
- China's surplus crude oil surges in June, giving refiners options 7/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction