F. Roessler
Felix Roessler earned his PhD working on a cooperation between Linde Engineering and the Chair of Plant and Process Technology of the Technical University of Munich, focusing on the flexible operation and demand side management of large-scale process plants. The main field of research was the development of digital twins of process plants. In 2021, Dr. Roessler joined Linde Engineering as a Process Engineer, working on the design and revamp of large-scale ethylene plants. He focuses on the electrification of ethylene plants in general and is a core member of the technical team developing Linde’s eFurnace technology for commercial-scale electrical heating.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- thyssenkrupp Uhde to build a low-emission polyester plant for KÖKSAN in Turkey 4/9
- Honeywell to supply digital process and automation technologies to the Dangote refinery 4/9
- Southern Energy Renewables and Axens Sign MoU to advance SAF projects in Louisiana and beyond 4/8
- One of the largest heat pumps in the world has reached BASF's Ludwigshafen site 4/8
- LANXESS introduces surcharge for Lewatit ion exchange resins 4/8
- HyOrc secures industrial site and accelerated permitting path for Portugal green methanol project 4/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

