Tellini, M.
Low-pressure absorption of CO2 from flue gas: Plant economics with incentives
Environment & Safety
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Carbon Management
/ Economics
/ Engineering & Design
/ Environment
/ Europe
/ Greenhouse Gases
/ Loss Prevention
/ Middle East
The precedent to this article, published in the April 2011 issue of Hydrocarbon Processing, discussed the chemical feasibility and process engineering design to absorb carbon dioxide (CO2) from flue g..
Low-pressure absorption of CO2 from flue gas
Environment & Safety
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Acid Gas Removal
/ Carbon Management
/ Corrosion
/ Europe
/ Natural Gas
/ Treating
Case study accomplished 95% sequestration using methyldiethanolamine aqueous solution
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- OXEA confirms final investment decision for major capacity expansion at plant 7/10
- TotalEnergies ships to Asia the first cargo produced by the ECA LNG plant 7/10
- ADNOC L&S expands LNG fleet with order for four new carriers 7/10
- India's ONGC plans to build 13-MMbbl national strategic oil reserve 7/10
- Russian refineries, oil terminal, tankers hit, Ukraine says 7/10
- Tajikistan says it has 60 days' fuel in reserve amid Russian supply crunch 7/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

