Al-Haroon, M.
Case history: Failure analysis of a syngas compressor
Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Middle East
/ Rotating Equipment
/ Safety
A first-stage impeller in a synthetic gas compressor failed after 20 years of service. The compressor is a six-stage centrifugal compressor driven by a steam turbine. This case history discusses the i..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

