Al-Haroon, M.
Case history: Failure analysis of a syngas compressor
Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Middle East
/ Rotating Equipment
/ Safety
A first-stage impeller in a synthetic gas compressor failed after 20 years of service. The compressor is a six-stage centrifugal compressor driven by a steam turbine. This case history discusses the i..
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Chiyoda, AVEVA forge strategic partnership to power plantOS with AVEVA CONNECT 6/27
- SABIC announces closure of Olefins 6 facility in Teesside, UK 6/27
- LyondellBasell's polyolefin technologies selected by SHCCIG Yulin for petrochemicals complex in China 6/27
- Damaged unit of Iran's South Pars refinery back operating 6/27
- hte conducts research for JGC to advance decarbonization by identifying suitable catalysts for ammonia cracking 6/26
- TES and CPC Finland to develop 500-MW e-NG project in Finland 6/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction