Fantolini, A. M.
is the LNG technology projects manager at Saipem Corporate. After graduating with a degree in chemical engineering, he gained 18 years of experience in the oil and gas industry, along with specific knowledge of LNG plant design.
Limit the rate of change of fuel gas properties with mixing drum
The fuel gas mixing drum is an integral part of many plants, especially LNG plants.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- bp's Gelsenkirchen refinery attracts buyer's interest from Klesch 2/10
- Fire at Baiji refinery contained, Iraq's Somo says 2/10
- Hengli Petrochemical sets up Dubai trading subsidiary in expansion 2/10
- Canadian airlines suspend Cuba flights as island set to run out of jet fuel 2/10
- Idemitsu Kosan plans maintenance at Keihin refinery in April 2/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

