Uzun, S.
Secil Uzun is a Process Equipment and Development Superintendent at Tüpraş headquarters. Her refining experience includes process simulation, equipment design, commissioning and startup for vacuum and coking units. She holds a BS degree in chemical engineering and an MS degree in fuel and energy technologies from Boğaziçi University in Istanbul, Turkey.
Processing hydrogen-rich gas in a PSA unit
At Tüpraş’ Kırıkkale refinery, adsorbents in pressure-swing adsorption (PSA) units must be reloaded due to the low hydrogen (H2) recovery and low capacity factor of such units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Root cause analysis on hydrochloric acid corrosion in a diesel hydrotreater unit 12/16
- Digital Feature: Enabling growth through strategic cost optimization for petrochemical and refining companies 12/16
- Rohm awards NextChem feasibility study for PMMA-polymer chemical recycling plant project 12/16
- Westlake to rationalize certain North American chlorovinyl and styrene assets 12/16
- CMB.TECH invests in Chinese ammonia supply 12/16
- Petrovietnam, BASF cooperate in developing green methanol, pioneering the energy transition 12/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

