King, M. J.
Improve your choice of process control algorithms
Process Control
/ Process Optimization
/ Americas
/ Analyzers
/ Asia/Pacific
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Information Systems
/ Middle East
/ Safety
This algorithm, when properly tuned, can greatly reduce the quantity of off-spec material made from a process upset. It can be the largest contributor to the benefits captured by improved process control.
Why don’t we properly train control engineers?
Process Control
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Information Systems
/ Middle East
While there are managers in the process industry that see training control engineers as a “no-brainer,” these are very much in the minority. They may send staff on courses covering configura..
Are you losing money when tuning controllers?
Process Control
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Economics
/ Engineering & Design
/ Europe
/ Middle East
Here are 10 rules, if followed, that will result in poor process performance
How to lose money with inferential properties
Fourteen more rules that, if followed, will ensure that advanced control will drive the unit further away from optimum operation
How to lose money with basic controls
Follow these 21 rules to ensure that many opportunities to minimize process disturbances will be completely overlooked
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

