April 2002
Columns
HP Reliability: First priority: pick the ripe, low-hanging fruit
In September 1999, we met with the reliability team of a well-known petrochemical company - let's call them "WKPC" - to discuss ways to improve the company's reliability performance. A..
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- Improve sour water stripper unit performance via feed sour water preconditioning
- Causes and countermeasures for a compressor lube oil system failure due to delayed oil pressure recovery by an auxiliary lube oil pump
- Application of systems engineering principles in a reliability assessment of air-cooled heat exchangers
Comments