October 2002
Special Report: Plant Safety and Reliability
Improve estimations for dynamic pressure waves from an explosion
Using a polar coordinate system, engineers can estimate risks on buildings and structures during the design phase
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Authors
Related Articles
- Causes and countermeasures for a compressor lube oil system failure due to delayed oil pressure recovery by an auxiliary lube oil pump
- Application of systems engineering principles in a reliability assessment of air-cooled heat exchangers
- The implementation and automation of an alarm management system in a complex control environment at KNPC’s Mina Al-Ahmadi refinery
Comments