September 2008
Corrosion/Maintenance
Caustic injection relocation project
Corrosion and fouling in the second preheat exchangers were eliminated
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Authors
Related Articles
- Improve sour water stripper unit performance via feed sour water preconditioning
- Causes and countermeasures for a compressor lube oil system failure due to delayed oil pressure recovery by an auxiliary lube oil pump
- Application of systems engineering principles in a reliability assessment of air-cooled heat exchangers
Comments