October 2013
Columns
HP Reliability: Why users must update design contractors’ understanding
In early 2012, a rotating equipment engineer was involved in a machinery quality assessment (MQA).1 Located halfway around the globe, this engineers new job was to oversee the engineering, procu..
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- New alternatives for severe service urea letdown valve applications
- Causes and countermeasures for a compressor lube oil system failure due to delayed oil pressure recovery by an auxiliary lube oil pump
- Application of systems engineering principles in a reliability assessment of air-cooled heat exchangers
Comments