Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Process Optimization

Jacobs wins engineering work on Afipsky refinery expansion in Russia

Jacobs was awarded a contract from Afipsky Refinery, located in the Krasnodarskij region of Russia, to develop a basic engineering package for an amine regenerator unit, a sour water stripper and an expected 55 tpd sulfur recovery unit (SRU). Officials did not disclose the contract value.

Williams picks CB&I for engineering on Louisiana petrochemical expansion

CB&I was awarded a $300 million contract by Williams for a petrochemicals expansion project in Geismar, Louisiana. Plant capacity is expected to be increased from 1.35 to 1.95 billion lb/year. Ethylene, mainly produced via steam cracking, is the world’s largest volume hydrocarbon.

Fluor to design Petronas LNG terminal in Malaysia

Fluor was awarded a contract by Petronas to provide front-end engineering and design (FEED) services for a new liquefied natural gas (LNG) regasification terminal in Malaysia. Fluor booked the undisclosed contract value in the first quarter of 2012. Financial terms were not disclosed.

Total taps Foster Wheeler for hydrodesulfurization revamp at Belgium refinery

Foster Wheeler has been awarded an engineering, procurement and construction management (EPCm) services contract by Total for the revamp of a hydrodesulfurization unit at Total’s refinery in Antwerp, Belgium. The value will be included in the company’s first-quarter 2012 bookings.

Foster Wheeler inks global services pact with Dow

Foster Wheeler has signed a strategic umbrella agreement with Dow Chemical for the provision of project management, consulting, engineering, procurement, construction management, and construction services. The deal offers support by Foster Wheeler to selected Dow global capital projects, the companies said.

CB&I wins $50mn deal for Canadian oil sands work

CB&I said Monday that has been awarded a contract, valued in excess of $50 million, for an oil sands project in Canada. The scope of work primarily includes the assembly of coke drums and a fractionator tower, according to the company. Details on the oil sands producer were not disclosed.

Understand multi-stage pumps and sealing options: Part 2

AESSEAL plc: Gooch, L.

As more processes involve high-pressure, toxic, flammable, lethal or explosive pumping services, better knowledge of rotating equipment options can boost productivity.

Use better designed turboexpanders to handle flashing fluids

Energent: Kaupert, K.

New models eliminate vibration problems and improve process reliability

Methanol contamination of naphtha: A case study

Al-Ghurair Energy: Ovaici, F.

Creative problem solving was used to upgrade off-spec export products while minimizing tank storage

HP Reliability: Pump alignment saves power

Hydrocarbon Processing Staff: Bloch, Heinz P.

Awareness of energy efficiency is one of the minimum job qualifications for reliability engineers. In the summer of 1994, Jack Lambley, then an intern at the Imperial Chemical Industries (ICI) Rocksav..