Vilela, T.
Tiago Vilela leads the Refinery Catalyst Testing (RCT) global services for Avantium. He has more than 20 yr of experience in engineering, project management, management consultancy and business development. Dr. Vilela earned an MS degree in chemical engineering from the University of Aveiro in Portugal, and his PhD in engineering from Delft University of Technology in the Netherlands. He can be contacted at Tiago.Vilela@avantium.com.
Sensible diesel hydrotreating catalyst selection: An independent catalyst testing approach
Catalysts
/ Desulfurization
/ Diesel
/ Economics
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Equipment
/ Hydrotreating
/ Loss Prevention
/ Petrochemicals
/ Process Optimization
/ Products
/ Project Management
/ Reactors
/ Refining
This article presents a case study that illustrates how independent catalyst testing was utilized to identify the most effective diesel hydrotreating catalyst.
Reliable naphtha reforming catalyst testing
Process Optimization
/ Refining
/ Analyzers
/ Catalysts
/ Distillation
/ Engineering & Design
/ Environment
/ Octane
/ Reactors
/ Sulfur
/ Treating
Naphtha-to-gasoline refining plays a significant role in the petrochemical refining industry.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Root cause analysis on hydrochloric acid corrosion in a diesel hydrotreater unit 12/16
- Digital Feature: Enabling growth through strategic cost optimization for petrochemical and refining companies 12/16
- Rohm awards NextChem feasibility study for PMMA-polymer chemical recycling plant project 12/16
- Westlake to rationalize certain North American chlorovinyl and styrene assets 12/16
- CMB.TECH invests in Chinese ammonia supply 12/16
- Petrovietnam, BASF cooperate in developing green methanol, pioneering the energy transition 12/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

