Kim, E.
Eunho Kim is a Junior Engineer on the Stationary Equipment Engineering team at SK energy. He is in charge of the FCCU, and has 5 yr of experience in detailed design and maintenance of equipment. He earned a BS degree in mechanical engineering from Inha University in South Korea.
Case study: Extend tube life in a waste heat boiler
Maintenance & Reliability
/ Refining
/ Boilers
/ Economics
/ Heat Transfer
/ Safety
/ Sulfur
/ Asia/Pacific
The sulfur recovery unit (SRU) separates sulfur from sulfur compounds.
Three topics for operational excellence related to a Cr-Mo hydrotreating reactor
Many end users are trying to use feedstock with higher sulfur content for their refineries to increase profitability, but numerous unknown or plausible bottlenecks exist.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 greenlights new gas plant and fractionator projects, advancing integrated wellhead-to-market strategy 5/18
- OXEA and Air Liquide renew syngas and hydrogen supply agreement for Oberhausen site 5/18
- Commonwealth LNG gets green light to start construction of $13-B, 9.5-MMtpy LNG terminal 5/15
- ARENA to drive Australia's $1.1-B Cleaner Fuels Program 5/15
- Japan’s first green ammonia plant based on KBR’s K-GreeN process now fully operational 5/15
- Repsol's Chairman asserts the role of refining as a strategic industry for Spain and for Europe 5/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

