Kim, E.
Eunho Kim is a Junior Engineer on the Stationary Equipment Engineering team at SK energy. He is in charge of the FCCU, and has 5 yr of experience in detailed design and maintenance of equipment. He earned a BS degree in mechanical engineering from Inha University in South Korea.
Case study: Extend tube life in a waste heat boiler
Maintenance & Reliability
/ Refining
/ Boilers
/ Economics
/ Heat Transfer
/ Safety
/ Sulfur
/ Asia/Pacific
The sulfur recovery unit (SRU) separates sulfur from sulfur compounds.
Three topics for operational excellence related to a Cr-Mo hydrotreating reactor
Many end users are trying to use feedstock with higher sulfur content for their refineries to increase profitability, but numerous unknown or plausible bottlenecks exist.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Phillips 66 greenlights new gas plant and fractionator projects, advancing integrated wellhead-to-market strategy 5/18
- OXEA and Air Liquide renew syngas and hydrogen supply agreement for Oberhausen site 5/18
- U.S. oil refiners finally profit from biofuels due to mandates, high fuel prices 5/18
- China's April oil throughput hits lowest since August 2022, inventories rise 5/18
- Vietnam receives first cargo of Congo Djeno crude for Nghi Son refinery 5/18
- Mexico's Pemex says brief fire at Olmeca refinery controlled, operations normal 5/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

