Goettler, L.
Leah Goettler is a Chemical Engineer with 4 yr of experience as a Process Engineer-in-Training at Sulphur Experts. During that time, she has been directly involved in more than 35 different sulfur recovery plant projects, with work ranging from testing and optimization to design evaluations across North America, Europe, Asia and the Eastern Mediterranean.
Impact of biofeed retrofits, co-processing on refinery amine units, SWSs and SRUs—Part 2
Environment & Safety
/ Process Optimization
/ Refining
/ Aromatics
/ Biofuels
/ Carbon Management
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Products
/ Reactors
/ Treating
Producing diesel with a portion of biologically sourced carbon is being done at an increasing number of conventional crude oil refineries.
Impact of biofeed retrofits, coprocessing on refinery amine units, SWSs and SRUs—Part 1
Environment & Safety
/ Process Optimization
/ Refining
/ Biofuels
/ Carbon Management
/ Catalysts
/ Construction
/ Diesel
/ Engineering & Design
/ Environment
/ Equipment
/ Greenhouse Gases
/ Loss Prevention
/ Products
/ Reactors
Diesel with a portion of biologically sourced carbon is being produced at an increasing number of conventional crude oil refineries.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Borouge, Borealis, CFF and PMS join forces to study polyolefin recycling ecosystem in Indonesia 2/10
- bp's Gelsenkirchen refinery attracts buyer's interest from Klesch 2/10
- Fertiglobe, Covestro and TA’ZIZ sign MoU to explore strategic ammonia collaboration 2/9
- S-Oil signs nearly $4-B PE marketing deal with SABIC 2/9
- Indonesia's Pertamina launches $7-B natural resources processing initiative 2/9
- Digital Exclusive: Innovative grassroots CDU-VDU configuration—Pioneering energy efficiency and net-zero pathways in modern refineries 2/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

